DIN-Compliant Reinforcement Production to Your Design Specifications.

We manufacture called-off reinforcement precisely to DIN specifications – using state-of-the-art machinery and highly advanced control and production software. Our efficient logistics concept ensures short processing times and rapid site delivery. Specialized load control systems minimize errors to an absolute minimum.

Thanks to state-of-the-art crane systems and direct rail connections, goods are stored efficiently while the loading process runs smoothly. Our material supply is flexible – by rail, truck, or inland waterway.

References – Structural and Civil Engineering

BAM Adlershof

Berlin – 2025 to 2026 – 2.000 Tons

Grünheide Fangschleuse

Grünheide – 2025 to 2026 – 1.000 Tons

ReuterBau4Future

Berlin – 2024 to 2027 – 2.000 Tons

Berlin Decks BT 02

Berlin – 2023 to 2024 – 1.500 Tons

Südkreuz Los 1-3 Gotenstraße

Berlin – 2019 to 2020 – 3.073 Tons

EUREF Campus

Berlin – 2018 to 2019 – 2.840 Tons

Lichtenberg Bridges

Berlin – 2023 to 2029 – 1.200 Tons

Exhibition Hall 12 Leipzig

Leipzig – 2022 to 2023 – 1.500 Tons

Exhibition Hall 12 Leipzig

Leipzig – 2022 to 2023 – 1.500 Tons

Dresden Railway

Berlin – 2022 to 2024 – 1.750 Tons